Normally, the cleanroom construction will go through the following steps. Of course, some steps can be done at the same time.
Step One: Floor Treatment
Step Two: Air Ducting System Installation (Main Ducting System)
- Air Supply Ducting
- Air Return Ducting
- Air Exhaust Ducting
Step Three: Paneling System Installation
- Wall Panels
- Ceiling Panel
- Doors&Windows
- Paneling Fittings
Step Four: Electric System Installation
- Lighting
- Power Distribution system for cleanroom equipment
- Power Distribution system for process equipment
- Others
Step Four: Flooring System
- Epoxy floor
- PVC floor
Step Five: AHU assembly and settlement
Step Six: Water Piping Installation